Secondary earnings arrive as load on the residual beam. Earnbeam treats that load as stated intake minus platform fees—weight on a member, not a narrative about future capacity.
Naming the load
Cite the instrument that defines gross and fee lines. Without both, the load cannot be placed and the beam mark is empty.
Limits of the member
The beam holds one residual reading. Taxes, schedules, and advice sit outside the structural mark and need separate notes.
Return to the beam index.